Information needed when troubleshooting closing or pending Change Packages issues in Integrity Lifecycle Manager/PTC RV&S
Applies To
- PTC RV&S (formerly Integrity Lifecycle Manager) 2007 to 13.3
Description
- Troubleshooting issues when Change Packages cannot be closed or pending entries cannot be discarded
- Errors when trying to work with a member or subproject
- MKS161633: The revision cannot be locked as it is a pending revision in change package <cpid>
- MKS125568: The operation cannot proceed because a pending operation for this member is already associated with change package <cpid>
- MKS125573: The operation cannot proceed because there is a pending <type> operation for subproject <subproject>
- change package referenced is closed or empty
- MKS125567: The operation cannot proceed because user <userid> has an operation pending on this member
- Pending member or subproject with closed change package
- Pending flag not removed when change package is committed
- Error message when trying to close a Change Package
- For example:
- MKS125577: Change Package <cpid> has pending entries and can not be closed
- MKS125529: This change package entry can not be discarded since a more recent change package entry involving the member exists
- MKS125211: The project file <project file path> is not registered with the current server
- Change Package contains a pending entry and
- member/subproject is not pending or
- Change Package is Closed or
- Change Package is Discarded