Article - CS218535
How changing max IPC values in the system kernel affects connections in Optegra
Modified: 21-Sep-2015
Applies To
- Optegra 5.0 to 16.1
Description
- How to control connections in Optegra
- Does Optegra utilize the max IPC values in the Unix kernel?
This is a printer-friendly version of Article 218535 and may be out of date. For the latest version click CS218535